Change task name on the spot
The long-awaited ability to quickly change the task name has appeared. You can do this right in the detailed view. Just click on the name...
(provided you have sufficient rights to edit this task)
Subtask block
1 Reassign, change deadlines and labels on the fly . All relevant symbols are clickable.
Tip: If you want to hide Labels in this column and leave only Statuses, do it on the Tasks by People page View > Statuses Only , and it will be inherited here.
2 Drag-n-drop of open tasks is possible bahrain mobile database anywhere in the task block, no longer need to look for a special area to grab and drag. Please note! Drag-n-drop functions are unlimited only in Manual sorting. In other sortings, drag-n-drop works only to change the hierarchy.
3 Added cost indicator. Hint will show numbers, and click will open window with details.
New You can change or set estimated costs directly from the cost entry window.
Previously, to do this you had to go to the full editing page.
Gantt chart
The padding on the right, left and bottom has disappeared. This gives the chart more space. It's always bad when there are two scrollbars on a page. We got rid of the horizontal one, replacing it with "push and drag". Just hold down the left mouse button over the chart grid and move it in any direction. The legend is now combined with the tooltip and can be called up by pressing F1 or from the menu.
1 — Added the ability to collapse a task, which now remembers its state! Its collapsed/expanded state is common with the task page.
2 - Avatars instead of names leave more space for Task titles.
3 — View Now you can Show tasks off-screen new , which means that when you move the grid left or right, there will be no jumps and all tasks will always remain in their places.
Detailed view of the task
-
- Posts: 630
- Joined: Tue Jan 07, 2025 4:25 am